Road infrastructure works

A thousand quotes a year, and every one starts by reading the project by hand.

An anonymised case study of a road-infrastructure contractor. No names and no prices, only the market, its quoting problem and how it could work better.

This study is based on a real conversation with someone in the market. All data is anonymised.

~1000quotes a year
~100enquiries from one client a year
A small %of them are won
PDFprojects, bills of quantities, drawings
The market

One stretch of work out of many parts of a big project.

Road-infrastructure contractors fit out finished roads: barriers, fences, signals and road signs, horizontal and vertical marking, traffic lights and street lighting. Most of the work is as a subcontractor under a general contractor that has won a large public tender, where their part is just one stretch out of many. Every project is priced individually: there is no fixed per-square-metre or per-unit price, the technical specifications differ, and the final price depends heavily on the distance to the site and the size of that part.

How it works today

A person reads the project and assembles by hand what matches what.

When a project comes in, a person reads the drawings and specifications, pulls together the material for their part and assembles a table by hand: what matches, what does not and what the quantities are. Only then does an experienced person model the final quote. About a thousand such quotes are submitted a year, one client alone can bring around a hundred enquiries, and only a small share is won. None can be skipped, because there is no telling in advance which one will land.

The bill of quantities often does not match the drawings, one way or the other, and the mismatches have to be found by sitting and counting by hand. On top of that come material certificates and declarations, so suppliers who handle those themselves are worth a little more.

Where it breaks

Problems that cost time and margin.

A huge volume of estimating

About a thousand quotes a year, of which only a small share is won. Every one still has to be calculated.

Reading the PDF by hand

Every quote starts with a person reading the project and assembling the quantities and mismatches by hand.

Bill of quantities vs drawings

Differences either way are found only by sitting and checking by hand, which takes a lot of time.

Price depends on distance

The same part costs completely differently near and far, so logistics and volume have to be assessed every time.

Supplier prices run late

While waiting for price answers, the bid deadline is short, so submissions are sometimes late by as much as a week.

What is really needed

Let the person model the price, not gather the data.

  • A module that extracts the segments from a PDF project: marking, signs, barriers, lighting, with quantities and units
  • A cross-check of the bill of quantities against the drawings with the mismatches flagged
  • A fast preliminary estimate from historical prices on whether a project is worth taking
  • Supplier prices and material specifications in one place
  • The person is left with only the review and modelling the final quote, not gathering data by hand
What limits it today
Quotes a year~1000
Wona small %
Project formatPDF
Slowest partreading by hand
The person models the price, not gathers the data
How it could look

An assistant that reads the project for you.

Imagine a tool where you upload the project and it separates out the segments and quantities on its own, and flags whatever is unclear.

Reads the whole project

It separates the segments out of the PDF, marking, signs, barriers, lighting, with quantities, units and distances.

Flags what is unclear

It cross-checks the bill of quantities against the drawings and flags mismatches and anything it could not read, with a link to the place in the project.

A fast preliminary estimate

From historical prices it gives an overview of whether a project is worth taking, before any detailed calculation begins.

The result: the person no longer loses time gathering data, can assess more enquiries and decides faster whether it is worth taking on.

The benefit

What it would change day to day.

Less manual work

The system gathers the data from the project, and the person is left with the decisions and the price.

Assess more enquiries

Faster preparation makes it possible to review more enquiries in the same time.

Fewer missed mismatches

The cross-check surfaces differences between the bill of quantities and the drawings before the quote is submitted.

A faster decision

A preliminary estimate makes it quick to decide whether to dig in or focus the effort elsewhere.

Summary

What to take away

1

Where the real problem sits

About a thousand quotes are produced a year, and every one starts with a person reading a PDF project by hand.

2

What most people miss

Only a small share is won, so most of the estimating time goes into quotes that will not be won. What matters is not accuracy to the cent but how fast you can reject the wrong enquiry.

3

What it fixes

The project is read automatically, the bill of quantities is checked against the drawings, and unclear places are flagged so a person only reviews those.

4

The benefit

The estimator models the price instead of collecting data, so far more enquiries are assessed in the same time.

You can send this summary to a colleague or save it as a PDF.

Does this sound like your situation?

If every quote also starts with reading the project by hand for you, let's talk. Together we will look at how this could work in your company.